Garden Structure – Karen’s Childcare

ABC Anchors were approached to assist in a solution for foundations at Karen’s Childcare. They wanted to expand the outdoor area for the children and the available space had a few challenges to overcome.

Site access and foundation positioning was limited, so screwpiles were identified as the best solution by the Client. The piles were to be installed behind a retaining wall and next to a boundary wall; therefore they needed a vibration free and non-destructive installation method to prevent damage.

We used our 400H Handheld pile installer due to a lack of space, ensuring a smooth installation. There was no damage to the wall, as the piles transferred load from the structure to below the wall to prevent it failing due to the additional load of the garden structure.

Our lightweight garden piles were specified by the team here as they were ideal for supporting the low loads (up to 2 tonnes per pile) and are suitable for most soil conditions. The 8 pile system was installed in a day and once finished, the structure could be built instantly, as screw piles are unique in not requiring any wet trades. This removes the time delay in the build for curing.

Our customer was happy we were able to find a solution to building on this tricky site and we are pleased to say they have now completed their garden structure.

“ABC Anchors provided an 8 screw pile solution in a difficult location that was installed by a very professional team of two. it is a great system that is providing support to our Outdoor Structure which was designed, manufactured and installed by Beyond Timber of Dinnington.”

David Ellison, Karen's Childcare

For more information on our services, or to talk to us about your own project, please feel free to contact us. If you have any questions on using a screw pile system, our FAQs may provide the answer!

We Are On Your Screens!

Save the Dates...

21st September

Dursley Tree House featured on Grand Designs!

Wednesday 21st September 9pm on Channel 4

This project will also be featured in The Sunday Times Homes section on the 18th September and Grand Designs magazine 12th September.

 

 

22nd September

Another to look out for! Woodman’s Treehouse

Thursday 22nd September 8pm on Channel 4

The building of the treehouse was filmed for the first episode of the new series of George Clarke's Amazing Spaces.

ABC Anchors are proud to be involved in these projects as the manufacturer of the piling work needed for the foundations . Dursley Tree House and Woodman’s Tree House are just one example of the solutions ABC Anchors has to offer to most screw pile applications.

Don't miss the opportunity to see our piles in action!

 

 

Julia’s House Children’s Hospice

This project involved installing 6 quantity 60RL* screw piles to support a small wooden Cabin.

Screw piles were the preferred choice of foundation for two reasons, firstly as there were tree roots and secondly, the ground dropped away by up to 1meter in some pile positions.

Using our 400H hand held torque head 2 rows of 3 piles were installed with the front 3 piles being installed to ground level and the back 3 protruding above ground level by approximately 1m.

As a precaution a cross brace of the 3 rear piles was designed to be used to ensure lateral stability.

The piles were terminated with a flat 200mm x 300mm plate which allowed easy connection of the steel ring beam for the cabin to sit on.

Once installation was complete it was found that the stability of the piles was adequate and cross bracing was not required on this occasion.

 

Customer’s feedback-

 A brilliant system which I wouldn’t hesitate to use in the future

Maurice Fishlock

 

*the 60RL is a light duty of the 60R, a cheaper option for low loadings, the difference between the 60R and 60RL is the tube thickness.

New Build – 89R Screw Piles Henley on Thames

89R piles were installed for foundations on this site in Henley on Thames. The site was particularly sensitive as it contained roman artefacts which if exposed would have halted the build. The installation of the piles also included a load test on a single pile which is sometimes asked for by the structural engineer to verify installation torque against pile capacity.

New Build Foundations

New Build -Screw Pile Foundations

Commonly used on Eco-Friendly projects, Screw Piles are becoming increasingly popular on New builds. Being able to pile close to tree roots and other foundations, that traditional foundations are unable to.

Key Features

No muck away
Minimal delays with instant torque and no time wasted waiting for materials to dry
Can be used near tree roots and other foundations

Grand Designs – New Build Screw Pile Foundations

ABC Anchors recently featured on Channel 4’s Grand Designs Programme,shown installing 60R screw piles with the ABC 500X torque head attached to a 2.5 tonne excavator.

The complete piling process took little over a day to install and offered accurate foundations which could be built on immediately.

The main structure was a 5 bedroom family home built to extremely high standards of environmental performance by FACIT HOMES using the latest onsite mobile production facilities.

Eco-Friendly foundation installed in 1.5 days

The whole project from breaking ground to moving in took just 7 months!