What size excavator will I need to install screw piles?
Pile Size | Working Loads | Torque Head/PAD Required | Excavator Size Required | Speed of Install |
---|---|---|---|---|
60R | Up to 48kN | 400H Handheld PAD | – | 30m per day |
Up to 60kN | 500X/XG Excavator Mounted | 2-7 Tonne | 50-60m per day | |
76R | Up to 73kN | 650H Handheld PAD | – | 30m per day |
Up to 180kN | 1600X Excavator Mounted | 5-8 Tonne | 50-60m per day | |
89R | Up to 250kN | 2500X/XG Excavator Mounted | 5-10 Tonne | 50-60m per day |