What size excavator will I need to install screw piles?

 

Pile Size Working Loads Torque Head/PAD Required Excavator Size Required Speed of Install
60R Up to 48kN 400H Handheld PAD  –  30m per day
Up to 60kN 500X/XG Excavator Mounted  2-7 Tonne  50-60m per day
76R Up to 73kN 650H Handheld PAD 30m per day
 Up to 180kN 1600X Excavator Mounted 5-8 Tonne 50-60m per day
89R Up to 250kN 2500X/XG Excavator Mounted 5-10 Tonne 50-60m per day