top of page

Do You Need Training to Install Screw Piles? What the Course Covers and Who It's For

3 hours ago
4 min read

No, there is no legal requirement to hold a certificate before installing screw piles. But the thing that separates a screw pile installation that works from one that does not is knowing how to read and record the installation torque — and that is not something you can pick up reliably on site.


That is what the course exists for, and it is worth understanding what it teaches before you decide whether you need it.


Why torque is the whole thing


A concrete pad has a capacity determined by its size and the ground beneath it, and you find out whether that ground is what you assumed after you have dug it. A screw pile tells you what it has found while it is being installed, before you build anything on it.


As the helix turns into the ground, the machine works harder in dense soil and less hard in soft soil. That resistance is measured as installation torque, and torque correlates directly to the pile's ultimate capacity. Higher torque means stronger ground and more load carried.


So you do not estimate capacity. You measure it, pile by pile, and you finish with a record for every one.


Which is excellent - provided somebody on site knows what the reading means, when it is telling you to keep going, and when it is telling you that you have a problem. That judgement is the difference between a documented foundation and a set of numbers nobody can interpret.


What the course covers


Our training covers both the theory behind the ABC Anchors screw piling system and the practical installation of screw piles using Autoguide's screw pile installation equipment. It combines classroom learning with practical installation work, and it is built around the knowledge, skills and practical experience needed to complete a screw anchor project safely and efficiently.


In practice, the sessions deal with:




  • Matching the pile to the job - our standard range runs from 60mm to 89mm shaft diameter, with wall thickness between 6.35mm and 9.5mm and torque limits from 4 kNm to 22.5 kNm.


  • Using the installation equipment properly, including handheld torque heads on restricted-access sites.


  • Recording and documenting installation properly, so the client and their engineer have evidence rather than assertion.


  • Working safely - the practical hazards of rotating equipment and hydraulic systems.


The training meets strict standards and quality benchmarks, which reflects our commitment to education within the construction industry.


Who should come on it


•     Contractors taking on screw pile work for the first time. This is the biggest group and the one that benefits most - the equipment is straightforward, the interpretation is not.


•     Groundworkers and operatives who will be installing day to day.


•     Site managers and supervisors who need to know whether what they are being told is right.


•     Structural and civil engineers who specify screw piles and want to understand what happens between the drawing and the finished foundation.


•     Companies hiring our equipment who want their own people competent rather than dependent.


Who probably does not need it


If you are a homeowner or a main contractor who will be employing a specialist installer, you do not need the course. You need to know what to ask them for — which is a torque record for every pile, and a named person responsible for interpreting it. Ask to see the records before work starts, not after.


Book a place or ask a question first


If you are not sure whether the course is right for your team, tell us what work you are taking on and we will tell you honestly whether you, your contractor or your structural engineer would benefit from the course.


Frequently Asked Questions


  1. Do you need a certificate to install screw piles?


No. There is no legal requirement to hold a certificate before installing screw piles. The important part is understanding how to install correctly, read and record installation torque, and interpret what the readings mean.


  1. What does the ABC Anchors screw pile training cover?


The training covers the theory behind the ABC Anchors screw piling system and practical installation. Topics include torque and load capacity, ground conditions, pile selection, installation equipment, installation records and safe working practices.


  1. Who is screw pile training suitable for?


It is aimed at contractors new to screw piling, groundworkers and operatives, site managers and supervisors, structural and civil engineers, and companies hiring installation equipment for their own teams.


  1. Why is installation torque important when fitting screw piles?


Installation torque reflects the resistance encountered in the ground and correlates with the pile's ultimate capacity. Recording the torque for each pile provides documented evidence that can be reviewed by the client and their engineer.


  1. Can the training cover handheld screw pile installation equipment?


Yes. The practical content includes the correct use of installation equipment, including handheld torque heads used on restricted-access sites.


  1. Do you receive a certificate after the training?


ABC Anchors does not typically issue a certificate or formal record of attendance. The training is focused on giving delegates the knowledge, skills and practical experience needed to carry out screw pile work safely and efficiently.


  1. Do homeowners need screw pile installation training?


Usually not if a specialist installer is carrying out the work. Homeowners and main contractors should ask for a torque record for every pile and know who is responsible for interpreting the results.



 
 
 

Comments


bottom of page